This is the story of how the first Passivhaus building in Oxford University, the Kellogg College Hub, was built. A timelapse camera recorded the whole process, starting on 30 August 2016 with the demolition of the existing sheds right through to the official opening on 2 May 2017.

The Hub was created to be the heart of the College, home to the Common Room and Café, and open to all College members. Its environmentally friendly Passivhaus design results in exceptionally low energy demand allied with the highest standards of occupant comfort. To find out more about what the Hub offers, click to view the College Hub web page.

Acting President Chris Davies ceremonially cuts the turf

Acting President Chris Davies ceremonially cuts the turf

Jonathan Michie and John Alexander of ASHTAV inspect the site

Jonathan Michie and John Alexander of ASHTAV inspect the site

Architect's drawing of the proposed College Hub

Architect’s drawing of the proposed College Hub